BOAT
RAMP PROJECT:
HUGE THANKS TO THE FOLLOWING NEIGHBORS FOR THEIR DONATIONS TO
THE BOAT RAMP FUND:
MICHAEL
& CATHY GARRETT
LINDA
CROCKETT
PHIL
COFFARO
RICHARD
ROGERS
LOUISE
LEWIS
The
following is the old bid including specification and renderings submitted
by Specialty Marine Contractors, Inc.
We
currently have: Boat Ramp Fund: $ 26,000 +
New Bids are being processed!!! 4-5-2007 |
Oct
8, 2003 OLD BID
Brantley
Isle HOA
C/O Mrs. Lynn Davis
2460 Island Dr
Longwood, FL 32779
ESTIMATE
/ CONTRACT
For demolition of existing construction of new 12’X50’
concrete & launch dock according to detailed drawings, scope of
work and general notes.
Contract Includes:
1. Obtain engineer sealed drawings
2. Obtain State DEP, Orange county EPD, & building permitting
3. Demo existing
4. Construct described structure, see detailed drawings
5. Remove construction debris
Terms: Total project cost: $18,840.00
(Amount due)
A) Contract signing, ready for permitting $1,000.00
B) Starting day, demolition completed $6,280.00
C) Passed inspection, ready to pour $6,280.00
D) Contract completed $6,280.00
E) Homeowner provides adequate survey & as built survey for permitting
purposes, property & N.H.W. line located by others
F) If collections of amount due with S.M.C. go into any legal litigation,
& homeowner is found responsible for payment, homeowner will be
responsible for payment of all legal services required to obtain any
money due.
G) Moves in location of said project, from where original agreement
once started will have a day labor rate of $400.00 applied to final
billing.
H) If State permitting or any other additional permitting is required,
an application processing fee of $500.00 plus cost of the application
fee will be added to first payment.
NOTE: In 2004 the EPA is fazing out CCA pressure treated lumber, the
use of ACQ non-arsenic lumber. If this comes into effect before your
job is started & only ACQ lumber is available, there will be a
minimal up charge to cover the cost difference in lumber & stainless
steel Nail & bolt pkg
Extra items requested, not specified in contact, will be billed at
$25.00 per man hour, plus cost of materials and 20% mark-up for overhead
expenditures and profit. Estimate firm for thirty days. All payments
are due within 48 hours of payment request, per scheduled draw, or
subject to maximum allowable interest. If contract is cancelled after
permits have started to no fault of contractor the contractor retains
the right of profit of the amount of 10% of original contract cost.
NOTE: Any unforeseen obstacles such as irrigation systems, dog fences,
electrical wires, etc, Specialty Marine Contractors, Inc. will not
be responsible for if damaged
Warranties:
· All warranties go into effect once final payment has been
received by Specialty Marine Contractors, Inc. within five days of
project completion.
· Payment provisions à up to 20% of final payment may
be withheld until completion of additional work requested by homeowner.
If 80% of final payment is received within the five-day period, the
warranty goes into effect immediately. If project has been completed
and final payment remains unpaid for five days from completion date,
warranties become null and void.
· Unconditional comprehensive warranty on project guaranteed
by Specialty Marine Contractors, Inc. for a period of one year from
the date of completion.
· Three year labor warranty covering installation; this covers
negligence by the installer to properly install said item according
to scope of work.
Accepted,
_________________________________
_________________________________
Mrs. Lynn Davis, Agent Date Michael A. Caiazza, President Date
Brantley Isle HOA Specialty Marine Contractors, Inc.
click
here to view page 1
click
here to view page 2
click
here to view boat ramp 12x50
click
here to view boat ramp |
Oct
8, 2003
Brantley Isle HOA
C/O Mrs. Lynn Davis
2460 Island Dr
Longwood, FL 32779
SCOPE OF WORK – Launching dock
For construction of 4’X30’ launching dock with 6X6 PT
piles left tall, 40” above pier with decorative post caps.
Contract Includes:
1. Piles: #2 grade 6X6 PT, 0.80 CCA 10’ max span
2. Floor frame: #2 grade 2X8 PT, 0.40 CCA
3. Decking: #1 grade 2X6 PT, 0.40 CCA
4. Bolting: Pile to floor frame 3/8” hot dipped
galvanized thru bolts
5. Bracing: Pile to pile with 3/8” hot dipped
galvanized lag screws.
Accepted,
_________________________________ _________________________________
Mrs. Lynn Davis, Agent Date Michael A. Caiazza, President Date
Brantley Isle HOA Specialty Marine Contractors, Inc.